Select the statements with proper terms, capitalization, symbols used in the Construction Documents.
1. In 1964, the term “Project Manual” was introduced by the:
a. American Bar Association
b. American Institute of Architects
c. Construction Specifications Institute
d. Yale University Professor Baerman
2. The Design Phase includes all of the following EXCEPT:
a. Construction Document Phase
b. Design Development Phase
c. Schematic Design Phase
d. Planning/Pre-Design Phase
3. The Agreement:
a. Establishes how the contract is administered
b. Provides for requirements unique to a specific project
c. Protects the labor force if the Contractor fails to meet his obligations
d. Defines relationship and obligations between the Owner and Contractor
4. The specification type document prepared during the Design
Development phase is called the:
a. Outline specifications
b. Rough Draft Specifications
c. Uniformat Elements
5. As part of the ________________________, the Agreement is considered a Contract Document.
a. Contract Conditions
b. Contract Forms
c. Bidding Requirements
d. Specifications